Here for the Long Haul
LNG and Kapalama Container Terminal are fueling stronger Pacific trade
Here for the Long Haul Read More »
LNG and Kapalama Container Terminal are fueling stronger Pacific trade
Here for the Long Haul Read More »
Albert C. Kobayashi Inc. (ACK) is general contractor on Alia, a new 39-floor luxury residential mixed-use tower at 888 Ala Moana Boulevard. ACK expects the project to support more than 500 jobs during construction, which is slated to start in mid-2023 and to end in early 2026. Developed by Kobayashi Group and BlackSand Capital, the
ACK to Break Ground Soonon Alia Read More »
The U.S. Navy in December signed a Record of Decision (ROD) supporting the construction of NAVFAC’s planned Dry Dock 3 Replacement project at Joint Base Pearl Harbor-Hickam (JBPHH). The ROD also identifies NAVFAC’s design for the project, estimated at a total cost of approximately $2 billion to $4 billion and reportedly the largest in NAVFAC
$2B Dry Dock Project Gets ROD Go-ahead Read More »
The Honolulu Authority for Rapid Transportation (HART) in December announced that U.S. Sen. Brian Schatz secured $63.8 million in new federal funding for Honolulu’s rail project. The grant is in addition to the remaining federal funds earmarked for HART by the Federal Transit Administration and is intended to cover inflationary cost increases if needed. According
$63M More for Rail Read More »
Annual awards return after a two-year hiatus
Craftsmanship, Tech Lead 2022 RCAH Awards Read More »